The framework runs for seven years, and is open not only to LSHTM, but also the University of London, Birkbeck, SOAS University of London, The Royal Veterinary College, and UKRI MRC. It encompasses Architectural, Mechanical and Electrical Engineering, Project Management, Quantity Surveying and Structural Engineering. BakerHicks are one of four companies appointed to provide Structural Engineering.
The LSHTM is renowned for their research, postgraduate studies and continuing education in public and global health. Ensuring its facilities continue to reflect their position as one of the world’s leading global health institutions is a key priority. This ambition has resulted in their selection of partners through the Designers Framework to provide best-in-class services to refurbish their current estate.
Key services to be provided under the framework include support to the planning, design, procurement, delivery and operational usage of capital projects and works programmes.
A high level of collaboration and close coordination with the LSHTM team and stakeholders will be required. At BakerHicks, we are leading exponents of using Building Information Modelling (BIM) to help our clients visualise the design and to coordinate solutions. And, we will look to bring this to projects within the framework to support LSHTM in achieving their vision within their specified budget.
The LSHTM’s main campus includes the impressive Grade II Listed buildings in Keppel Street, which will require a sensitivity to the historic environment in all maintenance and improvement works. BakerHicks have a long and successful track record of carrying out structural alterations on heritage buildings, including projects such as the refurbishment of the Grade B Listed Perth and Kinross Council headquarters and the Grade II Listed Belgrade Theatre in Coventry. This expertise will be invaluable to LSHTM in the refurbishment of their estate.
Projects on the framework are awarded through either mini-competitive tender or direct appointment, depending on the specific project and skills required.
Image courtesy of LSHTM